Details:
Wooden Planks / Sole Plate
Clean site and lay the wooden planks at the ground in horizontal position
Jack Base
It is a seat for adjusting the required scaffolding level above the wooden planks
Main Frame
Insert the main frame into jack base section in perpendicular
Cross Base
For fixing the main frame in each span of scaffolding
Arm Lock
It is being used to hold frames between lifts to prevent uplifting
Joint Pin
Insert onto the top of main frame for fixing the upper frame
Horizontal Frame / Walking Board
It is a lateral pipe frame used to hook onto the main frame
Wall Tie
Use wall tie to prevent the frames from tilting or collapsing